How to Import Plastic Raw Materials from China: A Buyer's Checklist

HomeImporting from China

Buying PP, PE, PVC and other resins from China is straightforward when specification, packaging, trade terms and documents are agreed up front. Use this checklist when planning your first order.

Step by step

  • Define the specification: polymer type, grade or application, melt flow rate or density, additives and approvals.
  • Request a quotation and technical data sheet (TDS) and confirm the grade is suitable for your process.
  • Confirm quantity, packaging and loading plan.
  • Agree trade terms, payment terms and delivery time in the quotation or contract.
  • Arrange shipping from the port of loading, usually Ningbo, and track the shipment.
  • Complete import clearance and receive the goods.

Packaging and loading

Resin is commonly packed in 25 kg bags on pallets, and some grades come in 1-tonne bulk bags. The minimum order quantity is one 40-foot full container (40FCL), about 24.75 tonnes. Packaging details are confirmed per order.

Trade terms and documents

  • Common terms: EXW, FOB, CFR, CIF and DDP. T/T is the preferred payment method, and L/C is also accepted.
  • Typical documents: commercial invoice, packing list, bill of lading and, where required, certificate of origin and a certificate of analysis or TDS.
  • Liquid chemicals such as isobutanol and methyl acrylate may require safety data sheet information and dangerous-goods handling.

HS codes for common materials

Your customs broker should confirm the exact code in your country. The first four digits are normally as follows.

MaterialHS heading
Polyethylene (PE)3901
Polypropylene (PP)3902
Styrene polymers including ABS, PS3903
PVC3904
Isobutanol2905
Methyl acrylate2916

Why Ningbo

Ningbo is one of the world's major container ports with frequent services to Southeast Asia, the Middle East, Europe and the Americas, which helps keep transit planning simple for resin shipments.

This article is a general material-selection reference only. Please rely on the supplier's technical data sheet (TDS), sample testing and the contract for the final selection.

Need a grade recommendation or a quote?

Tell us your application, processing method and expected volume. Our team replies within 24 hours.

Contact us